Wheeling Island Stadium to open after repairs

By  | 

WHEELING, W.Va. (AP) - The Ohio County Board of Education has voted to move ahead with a repair project at Wheeling Island Stadium.

News outlets report the board cast a 5-0 vote to accept bids Monday after M&G Architects and Engineers provided an analysis of the building.

Officials say crew removed a concrete panel from the top seating section on April 17 when its adjacent panel fell in uncontrolled fashion onto the facility's surrounding fence.

Eric Matyskiela of M&G Architects and Engineers says the panel failure isn't something that could've been easily noticed.

Superintendent Kim Miller says the stadium will open in mid-September and will not be ready for the OVAC All-Star game. She says required repairs will cost $700,000 and she hopes Wheeling Park High School's insurance policy will cover some costs.

(Copyright 2017 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)



 
Comments are posted from viewers like you and do not always reflect the views of this station. powered by Disqus